亚洲av激情五区,天堂AV资源在线观看,1769一区二区三区,久久99专区,日韩熟女人妻中文在线,69视频精品,操欧美日韩中文,日韩操逼无码免费观看,中文字幕在线日韩视频

Welcome to visitKunshan Tehui Plastic Mould Co., Ltd. official website!

Chinese| English| Japanese| Favorite/ Contact

0512-57628580

ewm
Contact us
Contact

Kunshan Tehui Plastic Mould Co., Ltd.
Contacts:Mr Bai
Tel:(86) 0512-57628580/50335774

Fax:(86) 0512-36809928

E-mail:tehui2011@163.com
Site:m.hongtaish.cn

Add:China:2838 Huanqing Road, Kunshan City, Jiangsu Province

Company news

Current location:Home --> Company news

Measures for improving the welding seam of plastic mold production

Author: ComeFrom: Date:2017/7/18 9:42:18 Hits:4104
In the injection molding plant in the injection of new technology often have a lot, and in the injection molding processing of the reasons for the weld, plastic products, the weld is the injection process from different directions of the molten resin in the junction can not be fully integrated and produced. Plastic mold production of plastic injection process due to the two resin flow at the fusion will not be mixed with each other; therefore, the lower the temperature, the more obvious the fusion marks, and the strength will be reduced. On the contrary, the higher the temperature, the adhesion will be enhanced. The bonding condition at the fusion point also depends on the pressure applied thereto. The lower the production pressure of plastic mold production, the worse the fusion, the lower the strength. The fusion is the confluence of the resin, and it may also be the flow tip of the flow tip, and if the gas is not provided in the position of the weld, it is possible to deteriorate the appearance and strength of the fusion.


Improvements:
L) plastic mold production to improve the resin temperature, improve the mold temperature, increase the injection pressure and speed;
2) Note that the exhaust of the parting surface increases the insert at the point where the weld is generated. The thimble is also ventilated.
3) choose a reasonable position into the plastic, plastic products before the mold is best to do mold flow analysis;
4) increase the process of waste material discharge material, forming and then cut off to be removed.
5) as much as possible to shorten the runner system to improve the go glue;
6) Matte products can try to choose coarse lines, which also help to improve the weld marks.
Contacts:Mr Bai   Tel: (86) 0512-57628580?50335774  
Fax: (86) 0512-36809928  E-mail: :tehui2011@163.com  Site:m.hongtaish.cn
Add.: 2838 Huanqing Road, Kunshan City

Copyright:Kunshan Tehui Plastic Mould Co., Ltd.  Technical Support:KSJINCHENG
Sweep, more exciting!
平南县| 伊通| 高淳县| 寿宁县| 建昌县| 高清| 尚义县| 斗六市| 彭州市| 明溪县| 怀来县| 拉孜县| 鹤山市| 吉林省| 宜良县| 新建县| 托克逊县| 疏勒县| 紫金县| 法库县| 疏附县| 樟树市| 怀柔区| 托克逊县| 广东省| 司法| 衡山县| 莲花县| 湟源县| 呼玛县| 建水县| 宁陵县| 阳原县| 商丘市| 岚皋县| 北宁市| 汶上县| 垫江县| 桃园县| 商都县| 南靖县|